Surface Preparation – Pavement Interactive
A top layer is milled off the existing pavement to provide a relatively smooth surface on which to pave. Milling is also commonly used to remove a distressed surface layer from an existing pavement. Milling machines are the primary method for removing old HMA pavement surface material prior to overlay (see Figures 1 and 6).
قرأ أكثر