Pavement Rehabilitation: Mill and Pave 200 mm (50 mm ACWC ...
Mill and Pave 200 mm (50 mm ACWC + 60 mm ACBC/DBM + 90 mm DBM) Area to be repaired is demarcated and confirmed at site with the Engineer representative. The milling work shall be done as mentioned in 2.3.A. Milling is done in stages as to get proper longitudinal joint with the offset as stated in the drawing at both sides (if required).
قرأ أكثر